Industrial Project
Becton Dickinson
Plan & Spec
Contract Type
Months
0
Contract Amount
$
0
- Contract Amount: $950,000
- Location: Columbus, NE
- Duration: 12 Months
- Contract Type: Plan & Spec
- Market: Life Sciences
- Owner: Riverstone Group
- General Contractor: Russell Construction
- Architect: Legat Architects
- Engineer: Ryan & Associates
Hawkins Construction chose Ryan & Assoicates for the addition and renovation of BD’s new glass sterilization process. Specialty construction activities included: stainless steel lined hot boxes (Cold Rooms); ETO Sterilization Process with separate centralized control room; conductive epoxy flooring; separate exhaust and supply systems with purge capabilities; and LEL and PPM Gas Monitoring Systems through MSA and California Analytical furnished controls.